The Build – Part 8
Part 8 is a short step; we’re basically bolting on the miscellaneous chassis bits prior to final assembly. Pretty easy.
Build Notes:
None.
Part 9 – Installing the electronics.
Back to the TLR 22SCT Build List
The Build – Part 8
Part 8 is a short step; we’re basically bolting on the miscellaneous chassis bits prior to final assembly. Pretty easy.
Build Notes:
None.
Part 9 – Installing the electronics.
Back to the TLR 22SCT Build List
Max out the performance in your next 1/10 scale Class 3 crawler build with these …